5 Part Series on the Construction of a Carriage Home

  • office7750
  • Apr 29
  • 1 min read

Part 3: Framing and Structural Work





Introduction

With the site prepared and the foundation set, the next phase involves framing and structural work. This stage is where your carriage house begins to take shape, as the skeleton of the building is constructed.


Erecting the Framework

The framing process involves constructing the skeleton of the carriage house using wood or steel beams. This includes building the walls, floors, and roof. Precision and attention to detail are essential to ensure structural integrity.





Installing Roof and Exterior Elements

Once the framework is in place, the roof structure is installed, followed by exterior elements such as windows and doors. This phase provides weatherproofing and security, protecting the interior from the elements.


Utility Rough-Ins

With the structure in place, the next step is installing the rough-ins for utilities. This includes electrical wiring, plumbing, and HVAC systems. Proper planning and coordination during this phase are crucial to avoid conflicts and ensure everything is correctly installed.


Insulation and Weatherproofing

Adding insulation to the walls, floors, and roof helps maintain a comfortable indoor environment and improve energy efficiency. Weatherproofing measures, such as sealing gaps and installing vapor barriers, protect the building from moisture and drafts.


Conclusion

Framing and structural work are pivotal in bringing your carriage house to life. With the skeleton in place and essential utilities installed, the project is ready to move on to the interior and exterior finishing touches.

 
 
 

Comments


GET IN TOUCH:

Tel: (250) 979-2909

Kelowna, B.C. Canada

CHBA Member.jpg
SICA logo.jpg
Accredited-Seals-Canada_PMS7469-HorizontalABSeal.png
travelers-vector-logo.png

CONTACT US:

Thanks for submitting!

  • Instagram - White Circle
  • Facebook - White Circle

© 2025 Rempel Builders. 

bottom of page